Phase 1 Development Plan

Phase 1 Development Plan Phase 1 construction planning table for the Xingzhong Branch, listing planned units, required floor areas, and building totals including Industry-Academia Office, R&D Division, Continuing Education Center, and Practicum & Laboratory facilities

Xingzhong Branch Phase 1 Major Construction Facilities Plan — Detailed Description

Planned Units and Required Floor Areas
Xingzhong Branch Phase 1 Major Construction Facilities — Required Floor Area Table
Facility Required Area (m²) Required Area (approx. ping) Remarks
A. Industry-Academia Office 2,646 800 Includes joint administrative center, conference rooms, and international conference hall
B. R&D Division – Agricultural Extension Center 991 300  
C. R&D Division – New Product Development and Management Research Center 1,322 400  
D. Continuing Education Center 991 300  
E. Practicum & Lab Zone – Aviation Maintenance Training Center 3,600 1,089 Space to be temporarily allocated from the Xingzhong Branch Phase 2 construction
F. Practicum & Lab Zone – Aircraft Maintenance Practicum Hangar 2,000 605  
G. Practicum & Lab Zone – Practicum Hangar 1,322 400  
H. Practicum & Lab Zone – Industry-Academia Cooperation Practicum Workshop 1,800 545  
I. Underground Parking Lot and Civil Defense Shelter 1,100 333  
Building Total Summary
Xingzhong Branch Phase 1 Building Total Floor Area Summary
Building Category Sub-item Required Area (m²) Required Area (approx. ping) Remarks
International Industry-Academia Cooperation Building (A+B+C+D) 5,950 1,800 Excluding common areas
Practicum Hangar 1 Aviation Maintenance Training Center (E) 3,600 1,089 Including common areas
Aircraft Maintenance Practicum Hangar (F) 2,000 605 Including common areas
Practicum Hangar 2 Practicum Hangar (G) 1,322 400 Including common areas
Practicum Hangar 3 Industry-Academia Cooperation Practicum Workshop (H) 1,800 545 Including common areas
Civil Defense Shelter Facilities Civil Defense Shelter and Parking Lot 1,100 333 Including common areas
Other Ancillary Facilities Campus gate, main substation, water tower, wastewater treatment plant, etc.  

← Return to original Phase 1 construction planning chart